Pricing
Published base rates, before you call anyone.
Base rates are per square foot of deliverable, before scope adjustments. They are not final prices: the final price is confirmed after a brief scope check. Every job has a $1,500 minimum.
Base rates
| Service | What it is | Rate |
|---|---|---|
| As-built plans | CAD and PDF measured to BOMA 2024 or REBNY; area report available separately | $0.12/sf |
| Revit model, LOD 200 | Scan-to-BIM from the same scan | $0.20/sf |
| Revit model, LOD 300 | Scan-to-BIM with more detail | $0.28/sf |
| Rent Recovery Audit | BOMA 2024 remeasure; scope and fees agreed before work begins | Quoted per building |
| Living Floor Plan | Plans kept current, with re-measures on tenant change | About $600/month |
| Area report | A BOMA 2024 or REBNY area report, as a separate optional item | Quoted individually |
Specialist services (conversion feasibility, fire and emergency planning support and gross floor area for benchmarking) are quoted per building.
The Rent Recovery Audit is quoted per building; see how the audit works and test a hypothetical scenario.
How estimates work
- Base rates are per square foot of deliverable, before scope adjustments. They are not final prices.
- Volume pricing: buildings of 100,000 to 300,000 sf are priced below the base rate. Building size, occupancy and scope are reflected in your estimate.
- Estimates show a range of plus or minus 10%. Final price confirmed after a brief scope check.
- Travel, where required, is shown separately in your quote.
- Buildings over 300,000 sf, campuses, MEP-dense buildings and LOD 350+ are quoted individually.
- Standard delivery within 72 hours of the completed scan, subject to confirmed scope and site access.
A worked example
Illustrative only, using the published base rate. It is not a quote.
| Property | Office, vacant |
|---|---|
| Size | 85,000 sf |
| Deliverable | As-built plans |
| Turnaround | Standard |
| Calculation | 85,000 sf × $0.12/sf = $10,200 |
| Estimate range | $9,180 to $11,220, before travel |
Schools and campuses
School floor-plan and mapping work is scoped per campus or portfolio after a conversation. Office rates, the minimum and the standard 72-hour delivery don't automatically apply. Discuss your school plans.
Price your building in three steps.
An estimate from published base rates, before travel.